Case
Over 1,500 green system EPC projects delivered for leading shipping companies such as MOL and Hapag-Lloyd.

Shaft Generator
Ship Type: 207K Bulk Carrier
Class: CCS
EPC Scope: Engineering design, equipment procurement.installation and commissioning, etc
Fuel saving: 3.8%
Installation Period: 25 Days

Hydrodynamic ESDs
Ship Type: 26K MPV
Class: ABS
EPC Scope: Engineering design, ESDs procurement,installation and sea tria
Fuel saving: 8.2%
Installation Period: 7 Days

Alternative Marine Power
Ship Type: 4250TEU Container
Class: CCS
EPC Scope: Engineering design, equipment procurement.
installation and commissioning, etc.
AMP Capacity:2MVA
Installation Period: 12 Days

Variable Frequency Drive
Ship Type: 64K Bulk Carrier
Class: ABS
EPC Scope: Engineering design, equipment procurement.
installation and commissioning, etc.
Fuel saving: 0.2T/Day
Installation Period: 12 Days

Wind Assisted Propulsion System
Ship Type: 207K Bulk Carrier
Class: NK
EPC Scope: Engineering design, equipment procurementinstallation and commissioning, etc.
Fuel saving: 7~10%
Installation Period: 21 Days

Carbon Capture & Storage
Ship Type: 3600TEU Container
Class: RINA
EPC Scope: Engineering design, equipment procurement.
installation and commissioning, etc.
Designed Co2 Capture Rate: 30%
Installation Period: 60 Days

Air Lubrication System
Ship Type: 180K Bulk Carrier
Class: LR
EPC Scope: Engineering design, equipment procurement,installation and commissioning, etc.
Fuel saving: 6%
Installation Period: Estimated 22 Days

Dual-Fuel System
Ship Type: 3653TEU Container
Class: DNV
EPC Scope: Engineering design, site supervision
Fuel System: LNG FGSS with 3 sets 1350m3 fuel tank
Installation Period: 60 Days

EGCS Project
Ship Owner: Hapag-Lloyd AG
Ship Type: 13000 TEU Container (9 vessels)
Class: LR
EPC Scope: Engineering design, equipment procurement, installation and commissioning, etc.
EGCS Maker: Alfa Laval